top of page
HOME
ABOUT US
SOLUTIONS
Marine Division
Helical Piles
STELCOR DDM
Geo-Joist
Earth Shoring
Load Testing
Underpinning
Rental
Hollow Bar
RESOURCES
Blog
Subscribe
Video Gallery
CONTACT US
Use tab to navigate through the menu items.
Video Gallery
Get a more in-depth look at our services and recent projects.
View on Youtube
Play Video
Play Video
Top - Down Excavation by CMI Structural Solutions Inc.
Highlight of a recent project using 7" helical piles for a shoring wall in Saratoga Springs, NY. This type of shoring can be temporary or permanent and is especially useful for areas that are too limited access for regular excavation methods. CMI provides turn-key shoring services, get in touch to get a design and quote!
Play Video
Play Video
Deep Foundation Specialists - CMI Structural Solutions
CMI specializes in geotechnical design and construction. We offer turnkey solution for your deep foundation needs, helical piles, STELCOR DDM, and Geo-Joist are some of the products we offer.
Play Video
Play Video
CMI | Geotechnical Design and Construction
Our company is dedicated to providing innovative and quality geotechnical solutions and have been for over 22 years. We specialize in deep foundation and foundation system design and construction, and consistently provide the most cost effective and efficient services to our clients. Have a deep foundation project or any questions? Get in touch!
Play Video
Play Video
Large Capacity Helical Piles for a new Woodspring Suites
CMI installed a total number of 205 helical piles which included 5.5" and 10.75" diameter piles. The new hotel and surrounding retaining wall are supported by piles.
Play Video
Play Video
What is Geo-Joist?
Geo-Joist. The stay-in-place form work cut form EPS foam, providing a shallow, frost-protected, structural foundation solution designed and engineered exclusively for each project to meet your specific set of needs.
Play Video
Play Video
Support of Excavation by CMI
New equipment for this glass factory required new foundations at a depth of 12' below the existing floor. CMI designed and installed the temporary shoring system for the project using helical piles and lagging. No spoils, no vibration, and the lagging can be re-used on the next project.
bottom of page